Dell PowerStore 5000X EMC PowerStore Installation and Service Guide - Page 113

Power control procedures preview, Powering off procedures for PowerStore node

Page 113 highlights

Power control procedures preview The following table provides a preview of the steps that are required to power off or up the relevant component in your cluster: Table 5. Power control procedures preview Component Node Action Power off PowerStore T model Use PowerStore Manager. Or Run a service script. PowerStore X model Use VMware vCenter server. Appliance Cluster Power on Reboot Power off Power on Power off Power on • If the node was removed • If the node was removed from the chassis, reseat the from the chassis, reseat the node into the chassis, and node into the chassis, reconnect its power cable. reconnect its power cable, • If the node was not removed and use VMware vCenter from the chassis, run a server. service script. • If the node was not removed from the chassis, run a service script and use VMware vCenter server. Use PowerStore Manager. Or Run a service script. Use VMware vCenter server. Run a service script. Use VMware vCenter server. If the nodes or expansion If the nodes or expansion enclosures were removed from enclosures were removed from the chassis, reseat the the chassis, reseat the expansion enclosures and nodes. expansion enclosures and nodes. Reconnect power cables in the Reconnect power cables in the right order. right order, and use VMware vCenter server. Use PowerStore Manager. Or Run a service script. Use VMware vCenter server. If the nodes or expansion If the nodes or expansion enclosures were removed from enclosures were removed from the chassis, reseat the the chassis, reseat the expansion enclosures and nodes. expansion enclosures and nodes. Reconnect power cables in the Reconnect power cables in the right order. right order, and use VMware vCenter server. Powering off procedures for PowerStore node This section includes the following procedures: • Power off a PowerStore T model node using PowerStore Manager on page 114 • Power off a PowerStore T model node using a service script on page 114 • Power off a PowerStore X model node on page 115 Power control procedures 113

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

Power control procedures preview
The following table provides a preview of the steps that are required to power off or up the relevant component in your cluster:
Table 5. Power control procedures preview
Component
Action
PowerStore T model
PowerStore X model
Node
Power off
Use PowerStore Manager.
Or
Run a service script.
Use VMware vCenter server.
Power on
If the node was removed
from the chassis, reseat the
node into the chassis, and
reconnect its power cable.
If the node was not removed
from the chassis, run a
service script.
If the node was removed
from the chassis, reseat the
node into the chassis,
reconnect its power cable,
and use VMware vCenter
server.
If the node was not removed
from the chassis, run a
service script and use
VMware vCenter server.
Reboot
Use PowerStore Manager.
Or
Run a service script.
Use VMware vCenter server.
Appliance
Power off
Run a service script.
Use VMware vCenter server.
Power on
If the nodes or expansion
enclosures were removed from
the chassis, reseat the
expansion enclosures and nodes.
Reconnect power cables in the
right order.
If the nodes or expansion
enclosures were removed from
the chassis, reseat the
expansion enclosures and nodes.
Reconnect power cables in the
right order, and use VMware
vCenter server.
Cluster
Power off
Use PowerStore Manager.
Or
Run a service script.
Use VMware vCenter server.
Power on
If the nodes or expansion
enclosures were removed from
the chassis, reseat the
expansion enclosures and nodes.
Reconnect power cables in the
right order.
If the nodes or expansion
enclosures were removed from
the chassis, reseat the
expansion enclosures and nodes.
Reconnect power cables in the
right order, and use VMware
vCenter server.
Powering off procedures for PowerStore node
This section includes the following procedures:
Power off a PowerStore T model node using PowerStore Manager
on page 114
Power off a PowerStore T model node using a service script
on page 114
Power off a PowerStore X model node
on page 115
Power control procedures
113