Power up the node, Verify the operation of a new part

Page 47 highlights

Figure 46. Installing the embedded module 2. When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever in place. Figure 47. Locking the release lever 3. Connect each cable into the same port from which it was removed. Power up the node Power up the node as described in Power control procedures. Verify the operation of a new part Steps 1. From PowerStore Manager, select Hardware. 2. Select the appliance where you installed the new part. 3. From the Hardware card, select the view of the system where the part was installed. The status of the new part should read Healthy. If the status is still Faulted, wait a few minutes and refresh PowerStore Manager. If the status does not change, ensure the part is correctly seated, or call support. Base enclosure service procedures 47

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

Figure 46. Installing the embedded module
2.
When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever in place.
Figure 47. Locking the release lever
3.
Connect each cable into the same port from which it was removed.
Power up the node
Power up the node as described in
Power control procedures
.
Verify the operation of a new part
Steps
1.
From PowerStore Manager, select
Hardware
.
2.
Select the appliance where you installed the new part.
3.
From the
Hardware
card, select the view of the system where the part was installed.
The status of the new part should read
Healthy
. If the status is still
Faulted
, wait a few minutes and refresh PowerStore Manager.
If the status does not change, ensure the part is correctly seated, or call support.
Base enclosure service procedures
47