Dell PowerStore 5000X EMC PowerStore Installation and Service Guide - Page 98

Installing a replacement LCC

Page 98 highlights

b. Press the orange handle buttons to release the LCC, pull the latches outward, and remove the LCC from its slot. 1 2 Figure 127. Removing an LCC CL5984 4. Place the LCC on a clean, static-free surface. Installing a replacement LCC Steps 1. Attach an ESD wristband to your wrist and the enclosure. 2. Pull out the latches on the LCC and make sure they stay in the open position. 3. Align the LCC with the enclosure opening and gently push the LCC straight into the enclosure, being sure the LCC is completely seated in the enclosure. 98 Expansion enclosure service procedures

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

b.
Press the orange handle buttons to release the LCC, pull the latches outward, and remove the LCC from its slot.
CL5984
2
1
Figure 127. Removing an LCC
4.
Place the LCC on a clean, static-free surface.
Installing a replacement LCC
Steps
1.
Attach an ESD wristband to your wrist and the enclosure.
2.
Pull out the latches on the LCC and make sure they stay in the open position.
3.
Align the LCC with the enclosure opening and gently push the LCC straight into the enclosure, being sure the LCC is completely
seated in the enclosure.
98
Expansion enclosure service procedures