Dell PowerStore 5000X EMC PowerStore Installation and Service Guide - Page 41

Power up the node, Verify the operation of a replacement part

Page 41 highlights

Figure 37. Installing the embedded module 2. When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever in place. Figure 38. Locking the release lever 3. Connect each cable into the same port from which it was removed. Power up the node Power up the node as described in Power control procedures. Verify the operation of a replacement part Steps 1. From PowerStore Manager, select Hardware. 2. Select the appliance where you replaced the faulted part. 3. From the Hardware card, select the view of the system where the part was replaced. The status of the replacement part should read Healthy. If the status is still Faulted, wait a few minutes and refresh PowerStore Manager. If the status does not change, ensure that the part is correctly seated, or contact your service provider. Base enclosure service procedures 41

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

Figure 37. Installing the embedded module
2.
When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever in place.
Figure 38. Locking the release lever
3.
Connect each cable into the same port from which it was removed.
Power up the node
Power up the node as described in
Power control procedures
.
Verify the operation of a replacement part
Steps
1.
From PowerStore Manager, select
Hardware
.
2.
Select the appliance where you replaced the faulted part.
3.
From the
Hardware
card, select the view of the system where the part was replaced.
The status of the replacement part should read
Healthy
. If the status is still
Faulted
, wait a few minutes and refresh PowerStore
Manager. If the status does not change, ensure that the part is correctly seated, or contact your service provider.
Base enclosure service procedures
41