HP A4500A Hardware Manual - rp24xx, Customer Viewable - Page 85

lifting or carrying the server.

Page 85 highlights

Server Slide Rail Installation Step 6. Locate and install the inner slides on the sides of the server, using M4 x 0.7mm machine screws. The inner rails contain a flat spring latch. The free end of the latch goes toward the front of the server, the riveted end goes toward the rear of the server chassis. Step 7. Double-check all mounting screws to ensure that they are tight. Step 8. Completely extend both outer slides to the front of the rack. Outer slides should latch in the extended position. Step 9. Align the inner rails on the server between the extended outer rails on the rack. WARNING The rp24xx server weights 22.68 kg (50 lbs). Use two people or a lift during installation. Take necessary precautions to prevent muscle strain when lifting or carrying the server. Chapter 93

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202

Chapter
Server Slide Rail Installation
93
Step 6.
Locate and install the inner slides on the sides of the server, using M4 x 0.7mm machine screws.
The inner rails contain a flat spring latch. The free end of the latch goes toward the front of the
server, the riveted end goes toward the rear of the server chassis.
Step 7.
Double-check all mounting screws to ensure that they are tight.
Step 8.
Completely extend both outer slides to the front of the rack. Outer slides should latch in the
extended position.
Step 9.
Align the inner rails on the server between the extended outer rails on the rack.
WARNING
The rp24xx server weights 22.68 kg (50 lbs). Use two people or a lift during
installation. Take necessary precautions to prevent muscle strain when
lifting or carrying the server.