HP A4500A Hardware Manual - rp24xx, Customer Viewable - Page 91
Cabinet Mounted Server Unpack, Overview, Installing a Factory-integrated Cabinet
View all HP A4500A manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 91 highlights
Cabinet Mounted Server Unpack Cabinet Mounted Server Unpack Overview rp24xx servers can be procured in two modes: stand-alone or pre-installed in a cabinet at the Hewlett-Packard factory. Stand-alone servers can be installed in an existing HP-supported cabinet by purchasing Rail Kit A5810A. Installing a Factory-integrated Cabinet Unpacking the Cabinet NOTE It is the customer's responsibility to inspect the shipping package for damage. It is the Hewlett-Packard Customer Engineer's responsibility to remove the cabinet assembly from the shipping pallet. WARNING A fully configured 2.0 meter cabinet can weigh over 500 kg (1100 lbs). Be careful not to tip the cabinet while unpacking. Failure to heed this warning can result in serious injury or death and equipment damage. To unpack the cabinet, perform the following steps: WARNING Wear protective glasses while cutting the plastic bands around the shipping container. These bands are under tension. Failure to heed this warning can result in serious eye injury if the severed bands snap back and hit you in the face. Step 1. Cut the plastic polystrap bands around the shipping container. Step 2. Follow the procedure listed below to prepare the cabinet for removal from the pallet: a. Lift the cardboard top cap off of the shipping box (callout 1). b. Remove the packing material underneath the cap (callout 2). c. Remove the clamshell box and place out of the way. d. Remove the screws that secure the ramps in place and lift the ramps out (callout 3). Chapter 99