HP Superdome SX2000 Installation Guide, Sixth Edition - HP Integrity Superdome - Page 65

Cell Board Ejectors, Front EMI Panel Flange and Cabinet Holes, If needed

Page 65 highlights

Figure 1-54 Cell Board Ejectors 4. Reinstall the front EMI panel (Figure 1-55). Figure 1-55 Front EMI Panel Flange and Cabinet Holes a. Hook the flange at the lower corners of the EMI panel into the holes on the cabinet. b. Position the panel at the top lip, and lift the panel up while pushing the bottom into position. If needed, compress the EMI gasket to seat the panel properly. c. Reattach the screw at the top of the EMI panel. 5. Check that the cables inside the rear enclosure are secure. Performing a Visual Inspection and Completing the Installation 65

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

Figure 1-54 Cell Board Ejectors
4.
Reinstall the front EMI panel (
Figure 1-55
).
Figure 1-55 Front EMI Panel Flange and Cabinet Holes
a.
Hook the flange at the lower corners of the EMI panel into the holes on the cabinet.
b.
Position the panel at the top lip, and lift the panel up while pushing the bottom into
position.
If needed, compress the EMI gasket to seat the panel properly.
c.
Reattach the screw at the top of the EMI panel.
5.
Check that the cables inside the rear enclosure are secure.
Performing a Visual Inspection and Completing the Installation
65