HP Superdome SX2000 Installation Guide, Sixth Edition - HP Integrity Superdome - Page 66
Conducting a Post-Installation Check, Reinstalling the Back EMI Panel
View all HP Superdome SX2000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 66 highlights
6. Reinstall the back EMI panel (Figure 1-56 (page 66)). a. Align the lip inside the cabinet with the lip on the EMI panel. Figure 1-56 Reinstalling the Back EMI Panel b. Push the EMI panel up and in. If needed, compress the EMI gasket at the top of the enclosure to get the panel to seat properly. c. Reattach the screw at the bottom of the EMI panel. Conducting a Post-Installation Check After the system is installed in a computer room and verified, conduct the post-installation check. Before turning the system over to the customer, inspect the system visually and clean up the installation area. Perform the following: • Inspect circuit boards. Verify that all circuit boards are installed and properly seated and that the circuit board retainers are reinstalled. • Inspect cabling. Ensure that all cables are installed, secured, and properly routed. • Inspect test points. Verify that test leads are removed from the test points and that the test points are properly covered. • Clean up and dispose of debris. Remove all debris from the area and dispose of it properly. • Perform final check. Inspect the area to ensure that all parts, tools, and other items used to install the system are disposed of properly. Then close and lock the doors. • Enter information in the Gold Book. When the installation and cleanup are complete, make the appropriate notations in the Gold Book shipped with the system. • Obtain customer acceptance (if required). Be sure to thank the customer for choosing HP. 66 Installing the System