Cisco ESR10008 Hardware Installation Guide - Page 116

Installing a Second AC PEM, Removing the Blank Cover

Page 116 highlights

Removing and Replacing Field-Replaceable Units Chapter 5 Maintaining the Cisco 10008 Router Installing a Second AC PEM Use the following procedure to install a second AC PEM in the bottom power bay for redundancy: Figure 5-25 Removing the Blank Cover 1 POWER FAULT LOOP ALARM CARRIER RX TX LINK FANS OK FAN FAILURE MULTIFAN FAILURE 1 CISCO 10000 2 CISCO 10000 3 CISCO 10000 bsrWeyemhsdteoeonvmnahelsoaihtnnCusduwtAdnarUodepwTeppnIrliaOntcwwgNeioltmlhmoiescnincftauumntre.utsrsaotyr, 4 CISCO 10000 0A PROCESSOR CISCO 10000 FAIL FAIL FAIL FAIL LOOP CARALRAIERRM LOOP CARALRAIERRM 0 0 1 1 2 2 3 3 4 4 5 5 SSLLOOTT01 CONSOLE AUX ELAICTNHTKIEVRITNYET 6XCT3-DS0 6XCT3-DS0 CH OC-12-DSO SM-IR GIGABIT ETHERNET ACO CMRAIJTOICRAL MINOR SFATAILTUS PROCESSOR 132834 1 Captive screws Step 1 Remove the front cover if necessary (see Front Cover Procedures, page 5-4). Step 2 Loosen the captive screws to remove the blank cover from the bottom power bay (Figure 5-25). 5-24 Cisco 10008 Router Hardware Installation Guide OL-0659-13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

5-24
Cisco 10008 Router Hardware Installation Guide
OL-0659-13
Chapter 5
Maintaining the Cisco 10008 Router
Removing and Replacing Field-Replaceable Units
Installing a Second AC PEM
Use the following procedure to install a second AC PEM in the bottom power bay for redundancy:
Figure 5-25
Removing the Blank Cover
Step 1
Remove the front cover if necessary (see
Front Cover Procedures, page 5-4
).
Step 2
Loosen the captive screws to remove the blank cover from the bottom power bay (
Figure 5-25
).
1
Captive screws
1
3
2
4
0A
PROCESSOR
PROCESSOR
FANS
OK
FAN
FAILURE
MULTI-
FAN
FAILURE
When hot swapping this fan tray,
removal and replacement must
be done in under two minutes or
system shutdown will occur.
CAUTION
POWER
FAULT
CISCO
10000
LINK
TX
RX
FAIL
GIGABIT ETHERNET
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
CH OC-12-DSO SM-IR
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
FAIL
CONSOLE
STATUS
ACO
CRITICAL
MINOR
MAJOR
ETHERNET
LINK
ACTIVITY
AUX
SLOT 0
SLOT 1
CISCO
10000
132834
1