Cisco ESR10008 Hardware Installation Guide - Page 45

Flush-Mounting in a 19-Inch Rack

Page 45 highlights

Chapter 3 Installing the Cisco 10008 Router Rack-Mounting the Chassis Flush-Mounting in a 19-Inch Rack The Cisco 10008 chassis can be flush-mounted in a 19-inch equipment rack using the rack-mounting kit provided with your system. The rack-mounting kit contains • Two mounting brackets • One cable management bracket • Mounting screws Warning At least three people are required to mount the chassis in the equipment rack: two people are needed to hold the chassis in place while a third person tightens the mounting screws. Statement 234 When handling the chassis, always follow proper lifting practices as outlined in the "Electrical Safety" section on page 2-13. Use the following procedure to flush-mount the Cisco 10008 chassis in a 19-inch equipment rack: Figure 3-1 Attaching Chassis to Equipment Rack POWER FAULT MISWIRE POWER FAULT MISWIRE RX TX CARRIER LOOP ALARM CARRIER RX TX LINK FANS OK FAN FAILURE MULTIFAN FAILURE WrbseyemhsdetoeonvmnahelsoaihtnnCusduwtAdnarUodepwTeppnIrliaOntcwwgNeioltmlhmoiescnincftauumntre.utsrsaotyr, 1 CISCO 10000 2 CISCO 10000 3 CISCO 10000 4 CISCO 10000 FAIL FAIL FAIL FAIL LOOP CARALRAIERRM LOOP CARALRAIERRM 0 0 1 1 2 2 SSLLOOTT01 SSLLOOTT01 0A PROCESSOR ONLY0B CISCO 10000 CISCO 10000 CONSOLE AUX ELAICTNHTKIEVRITNYET CONSOLE AUX ELAICTNHTKIEVRITNYET LOOP CARALRAIERRM LOOP CARALRAIERRM LOOP CARALRAIERRM FAIL FAIL FAIL 5 CISCO 10000 0 6 CISCO 10000 0 7 CISCO 10000 0 1 1 1 3 3 2 2 2 4 4 5 5 3 3 3 4 4 4 5 5 5 FAIL 8 CISCO 10000 ACO CMRAIJTOICRAL MINOR SFATAILTUS ACO CMRAIJTOICRAL MINOR SFATAILTUS PROCESSOR ONLY OC-12/STM-4 POS SM-IR 6XCT3-DS0 6XCT3-DS0 6XCT3-DS0 PERFORMANCE ROUTING ENGINE PERFORMANCE ROUTING ENGINE 6XCT3-DS0 6XCT3-DS0 CH OC-12-DSO SM-IR GIGABIT ETHERNET 30010 OL-0659-13 Cisco 10008 Router Hardware Installation Guide 3-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

3-3
Cisco 10008 Router Hardware Installation Guide
OL-0659-13
Chapter 3
Installing the Cisco 10008 Router
Rack-Mounting the Chassis
Flush-Mounting in a 19-Inch Rack
The Cisco 10008 chassis can be flush-mounted in a 19-inch equipment rack using the rack-mounting kit
provided with your system. The rack-mounting kit contains
Two mounting brackets
One cable management bracket
Mounting screws
Warning
At least three people are required to mount the chassis in the equipment rack: two people are needed
to hold the chassis in place while a third person tightens the mounting screws.
Statement 234
When handling the chassis, always follow proper lifting practices as outlined in the
“Electrical Safety”
section on page 2-13
.
Use the following procedure to flush-mount the Cisco 10008 chassis in a 19-inch equipment rack:
Figure 3-1
Attaching Chassis to Equipment Rack
30010
1
3
2
4
0A
PROCESSOR ONLY
0B
5
6
7
8
PROCESSOR ONLY
POWER
FAULT
MISWIRE
POWER
FAULT
MISWIRE
CISCO
10000
LINK
TX
RX
FAIL
GIGABIT ETHERNET
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
CH OC-12-DSO SM-IR
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
FAIL
PERFORMANCE ROUTING ENGINE
CONSOLE
STATUS
ACO
CRITICAL
MINOR
MAJOR
ETHERNET
LINK
ACTIVITY
AUX
SLOT 0
SLOT 1
FAIL
PERFORMANCE ROUTING ENGINE
CONSOLE
STATUS
ACO
CRITICAL
MINOR
MAJOR
ETHERNET
LINK
ACTIVITY
AUX
SLOT 0
SLOT 1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
TX
RX
FAIL
OC–12/STM–4 POS SM–IR
FANS
OK
FAN
FAILURE
MULTI-
FAN
FAILURE
When hot swapping this fan tray,
removal and replacement must
be done in under two minutes or
system shutdown will occur.
CAUTION
CISCO
10000
CISCO
10000