Dell Brocade G620 Hardware Installation Guide - Page 21

Quick installation checklist, TABLE 4

Page 21 highlights

Quick installation checklist TABLE 4 Facility requirements (Continued) Type Requirements Thermal • A minimum airflow of 79.8 cubic meters/hour (47 cubic ft/min.) available in the immediate vicinity of the switch NOTE Although this airflow may exceed the airflow maximum listed in the device Technical Specifications, the additional airflow is recommended to pressurize the inlet (cool isle) side of rack installations relative to the exhaust side to minimize recirculation of hot air back to the inlet side. • Ambient air temperature not exceeding 40°C (104°F) while the switch is operating Rack (when rack-mounted One rack unit (1U) in a 48.3 cm (19-inch) rack All equipment in the rack grounded through a reliable branch circuit connection Additional weight of switch not to exceed the rack's weight limits Rack secured to ensure stability in case of unexpected movement Quick installation checklist This checklist provides a high-level overview of the basic installation process from the planning stage to the point where the device comes online and is ready to be deployed. Completing all the tasks in the suggested order ensures successful installation. Brocade recommends that you print this checklist and take it to the installation site. Pre-installation tasks Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation ensures seamless installation, especially when installing multiple devices. TABLE 5 Installation prerequisites Task Task details or additional information Completed Unpack the device. Take an inventory of the hardware components included in your shipment. Refer to Shipping carton contents on page 23. Gather necessary components and required tools. Review the time and items required information at the beginning of each chapter to ensure you have gathered all necessary components required for the following installation tasks: • Mounting the Device on page 25 • Power Supply and Fan Assembly on page 75 • Installing Transceivers and Cables on page 59 Review the safety precautions. Refer to Safety precautions on page 17. For translations, refer to Cautions and Danger Notices on page 95 at the end of this guide. Brocade G620 Hardware Installation Guide 21 53-1003990-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

Facility requirements (Continued)
TABLE 4
Type
Requirements
Thermal
A minimum airflow of 79.8 cubic meters/hour (47 cubic ft/min.) available in the
immediate vicinity of the switch
NOTE
Although this airflow may exceed the airflow maximum listed in the device
Technical Specifications, the additional airflow is recommended to pressurize the
inlet (cool isle) side of rack installations relative to the exhaust side to minimize
recirculation of hot air back to the inlet side.
Ambient air temperature not exceeding 40°C (104°F) while the switch is operating
Rack (when rack-mounted)
One rack unit (1U) in a 48.3 cm (19-inch) rack
All equipment in the rack grounded through a reliable branch circuit connection
Additional weight of switch not to exceed the rack’s weight limits
Rack secured to ensure stability in case of unexpected movement
Quick installation checklist
This checklist provides a high-level overview of the basic installation process from the planning stage to
the point where the device comes online and is ready to be deployed. Completing all the tasks in the
suggested order ensures successful installation. Brocade recommends that you print this checklist and
take it to the installation site.
Pre-installation tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and
site preparation ensures seamless installation, especially when installing multiple devices.
Installation prerequisites
TABLE 5
Task
Task details or additional information
Completed
Unpack the device.
Take an inventory of the hardware components included in your shipment. Refer to
Shipping carton contents
on page 23.
Gather necessary components and
required tools.
Review the time and items required information at the beginning of each chapter to
ensure you have gathered all necessary components required for the following
installation tasks:
Mounting the Device
on page 25
Power Supply and Fan Assembly
on page 75
Installing Transceivers and Cables
on page 59
Review the safety precautions.
Refer to
Safety precautions
on page 17. For translations, refer to
Cautions and
Danger Notices
on page 95 at the end of this guide.
Quick installation checklist
Brocade G620 Hardware Installation Guide
21