Dell Brocade G620 Hardware Installation Guide - Page 56

Establishing an Ethernet connection, Setting the domain ID, Verifying correct operation

Page 56 highlights

Establishing an Ethernet connection Establishing an Ethernet connection Perform the following steps to establish an Ethernet connection to the device. 1. Remove the plug from the Ethernet port. 2. Connect an Ethernet cable to the device Ethernet port and to the workstation or to an Ethernet network containing the workstation. NOTE At this point, the device can be accessed remotely, by command line or by Web Tools. Ensure that the device is not being modified from any other connections during the remaining tasks in this chapter. The Ethernet management port also supports Auto MDI/MDIX. Setting the domain ID Perform the following steps to set the switch domain ID. 1. Log in to the switch through Telnet using the admin account. 2. Modify the domain ID if required. The default domain ID is 1. If the switch is not powered on until after it is connected to the fabric and the default domain ID is already in use, the domain ID for the new switch is automatically reset to a unique value. If the switch is connected to the fabric after it has been powered on and the default domain ID is already in use, the fabric segments. To find the domain IDs that are currently in use, enter the fabricShow command on another switch in the fabric. Perform the following steps to modify the domain ID. a) Disable the switch by entering the switchDisable command. b) Enter the configure command. The command prompts display sequentially; enter a new value or press Enter to accept each default value. c) Enter y after the "Fabric param" prompt. Fabric param (yes, y, no, n): [no] y d) Enter a unique domain ID (such as the domain ID used by the previous switch, if still available). Domain: (1..239) [1] 3 e) Complete the remaining prompts or press Ctrl+D to accept the remaining settings without completing all the prompts. f) Re-enable the switch by entering the switchEnable command. Verifying correct operation Perform the following steps to verify correct operation of the device. 1. Check the LEDs to verify that all components are functional. 2. Verify the correct operation of the device by entering the following commands from the workstation. 56 Brocade G620 Hardware Installation Guide 53-1003990-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

Establishing an Ethernet connection
Perform the following steps to establish an Ethernet connection to the device.
1.
Remove the plug from the Ethernet port.
2.
Connect an Ethernet cable to the device Ethernet port and to the workstation or to an Ethernet
network containing the workstation.
NOTE
At this point, the device can be accessed remotely, by command line or by Web Tools. Ensure that
the device is not being modified from any other connections during the remaining tasks in this
chapter. The Ethernet management port also supports Auto MDI/MDIX.
Setting the domain ID
Perform the following steps to set the switch domain ID.
1.
Log in to the switch through Telnet using the admin account.
2.
Modify the domain ID if required.
The default domain ID is 1. If the switch is not powered on until after it is connected to the fabric and
the default domain ID is already in use, the domain ID for the new switch is automatically reset to a
unique value. If the switch is connected to the fabric after it has been powered on and the default
domain ID is already in use, the fabric segments. To find the domain IDs that are currently in use,
enter the
fabricShow
command on another switch in the fabric.
Perform the following steps to modify the domain ID.
a) Disable the switch by entering the
switchDisable
command.
b) Enter the
configure
command. The command prompts display sequentially; enter a new value or
press
Enter
to accept each default value.
c) Enter
y
after the "Fabric param" prompt.
Fabric param (yes, y, no, n): [no] y
d) Enter a unique domain ID (such as the domain ID used by the previous switch, if still available).
Domain: (1..239) [1] 3
e) Complete the remaining prompts or press
Ctrl+D
to accept the remaining settings without
completing all the prompts.
f)
Re-enable the switch by entering the
switchEnable
command.
Verifying correct operation
Perform the following steps to verify correct operation of the device.
1.
Check the LEDs to verify that all components are functional.
2.
Verify the correct operation of the device by entering the following commands from the workstation.
Establishing an Ethernet connection
56