Dell Brocade G620 Hardware Installation Guide - Page 58
Powering down the device, Shutdown the Fabric OS software.
![]() |
View all Dell Brocade G620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 58 highlights
Powering down the device 1. Log in to the device as the admin user. 2. Back up the device configuration to an FTP server by entering the configUpload command and following the prompts. sb_70:admin> configupload Protocol (scp, ftp, local) [ftp]: Server Name or IP Address [host]: 192.168.0.100 User Name [user]: anonymous Path/Filename [/config.txt]: /dumps/supportsave/pz/switch85/G20-1.txt Section (all|chassis|switch [all]): all configUpload complete: All selected config parameters are uploaded This command uploads the device configuration to the server, making it available for downloading to a replacement device if necessary. NOTE If Virtual Fabrics (VF) is enabled, you must enter configUpload for each VF separately. Powering down the device Complete the following steps to power down the device. 1. Shutdown the Fabric OS software. 2. Identify the power-on switches in the nonport-side of the device. 3. Power off both power supplies by setting each power switch to the "O" position. 4. Unplug the power cables from the power source before servicing the device or FRUs. All devices are returned to their initial state the next time the switch is powered on. 58 Brocade G620 Hardware Installation Guide 53-1003990-01
![](/manual_guide/products/dell-brocade-g620-hardware-installation-guide-12e7feb/58.png)