Brother International BES-116 Instruction Manual - English - Page 114
Operating Procedures, 1-1 Power Source, 1-2 Preparation for Embroidering
View all Brother International BES-116 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 114 highlights
Chapter 6 Operation of Machine 1. Operating Procedures 1-1 Power Source 1. Turn the power on to the machine. 2. When the machine is equipped with the shut-off switch unit, Reset the emergency stop button. 3. When the machine is equipped with the shut-off switch unit, Press the power switch. 4. A message is displayed on the LCD. Power switch Emergency stop switch • The alarm sounds three times and the needle bar and the presser foot move upward. Then the hoop moves to the zero point and the sewing data screen is displayed. Note) When turning the power off and back it on again, wait for at least 10 seconds. 1-2 Preparation for Embroidering • Select embroidering data. • Using the jog switches ( ), determine a position to start embroidering. Note) An error message is displayed on the LCD if a pattern comes out of the hoop. • Pressing starts embroidering. • After embroidering is finished, the machine is placed in the stand-by state. 112 BES-116AC