Brother International BES-116 Instruction Manual - English - Page 28

Connection to Power Source, 4-5 Preparation of Machine for Operation

Page 28 highlights

Chapter 1 Preparation of Embroidery Machine 4-4 Connection to Power Source DANGER Be sure to connect an earth cable. Failure to do so may result in electric shock. Use a cord plug that matches the receptacle type. 4-5 Preparation of Machine for Operation Check the following before turning on the power Thread Embroidery hoop Needle stop position (1) Is upper thread setting complete? (3) Is thread passed through needle? (1) Is there any looseness in the material? (1) Is thread take-up positioned correctly? (2) Is the thread passed smoothly? (4) Is the lower thread setting complete? (2) Is the hoop clamped securely? (2) Is needle bar positioned at the top? Check that the thread take-up lever is aligned with the index mark. Turning on the power switch brings up the message "Moving frame" and sounds a beep as a warning. Then, the X and Y carriages move the embroidery hoop to the home position or the position where it was located at the end of the previous operation. Check that there is no obstacle above the hoop which will interfere with needle or presser foot. 26 BES-116AC

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153

Chapter 1
Preparation of Embroidery Machine
BES-116AC
26
Be sure to connect an earth cable.
Failure to do so may result in electric shock.
Use a cord plug that matches the receptacle type.
4-4 Connection to Power Source
DANGER
4-5 Preparation of Machine for Operation
Check the following before turning on the power
Thread
(1) Is upper thread setting complete?
(2) Is the thread passed smoothly?
(3) Is thread passed through needle?
(4) Is the lower thread setting complete?
Embroidery hoop
(1) Is there any looseness in the material?
(2) Is the hoop clamped securely?
Needle stop position
(1) Is thread take-up positioned correctly?
(2) Is needle bar positioned at the top?
Check that the thread take-up lever is
aligned with the index mark.
Turning on the power switch brings up the
message "Moving frame" and sounds a
beep as a warning.
Then, the X and Y
carriages move the embroidery hoop to the
home position or the position where it was
located at the end of the previous
operation.
Check that there is no obstacle
above the hoop which will interfere with
needle or presser foot.