HP StorageWorks 300 HP StorageWorks 300 Virtual Library System user guide (AH1 - Page 139

Replacing a primary node, Aligning the processor pins with the socket holes

Page 139 highlights

Figure 84 Aligning the processor pins with the socket holes 3. Install the processor and close the processor locking lever (2) and processor retaining clips (1). 1 1 3 2 Figure 85 Closing the processor locking lever and retaining clips 4. Lower the processor retaining card. 5. Install the access panel. See Installing the VLS node access panel. 6. Slide the node into the rack. 7. Power on the node. See Powering on the VLS300 system. Replacing a primary node CAUTION: Each VLS300 node weighs 16.78 kg (37 lb) full. At least two people are required to lift and move each node. To replace a primary node: 1. Remove the existing node from the rack: a. Power off the system. See Powering off the system. b. From the back of the node, make a note of all cable connections then disconnect the cables. HP StorageWorks 139

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180

Figure 84 Aligning the processor pins with the socket holes
3.
Install the processor and close the processor locking lever (2) and processor retaining clips (1).
1
1
2
3
Figure 85 Closing the processor locking lever and retaining clips
4.
Lower the processor retaining card.
5.
Install the access panel. See
Installing the VLS node access panel
.
6.
Slide the node into the rack.
7.
Power on the node. See
Powering on the VLS300 system
.
Replacing a primary node
CAUTION:
Each VLS300 node weighs 16.78 kg (37 lb) full. At least two people are required to lift and move
each node.
To replace a primary node:
1.
Remove the existing node from the rack:
a.
Power off the system. See
Powering off the system
.
b.
From the back of the node, make a note of all cable connections then disconnect the cables.
HP StorageWorks
139