HP StorageWorks 300 HP StorageWorks 300 Virtual Library System user guide (AH1 - Page 32

Secondary node ports, second external FC switch/fabric that connects to your external array.

Page 32 highlights

j. Begin routing the cables through the cable ties that shipped with the racks. 2. On the secondary node(s) of the VLS300: NOTE: Use this procedure to install any secondary node-node 1 which is shipped with the gateway or upgrade nodes 2-7 which can be ordered separately. 12 34 7 8 5 6 1 Dual port FC card, host port, port 0 2 Dual port FC card, host port, port 1 3 Dual port FC card, storage port, port 3 4 Dual port FC card, storage port, port 2 5 NIC2, on secondary nodes connects to the next available port of switch 2824 6 USB port, connects to USB/Ethernet adapter 7 Power supply 2 8 Power supply 1 11153 Figure 9 Secondary node ports a. Connect one end of an FC cable (not provided) to host port 0. Connect the other end to an external FC switch/fabric that connects to your tape backup hosts. b. If desired, connect one end of an FC cable (not provided) to host port 1. Connect the other end to an external FC switch/fabric that connects to your tape backup hosts. Otherwise, connect a loopback plug to host port 1. c. Connect one end of an FC cable (not provided) to device port 3. Connect the other end to an external FC switch/fabric that connects to your external array. d. Connect one end of an FC cable (not provided) to device port 2. Connect the other end to a second external FC switch/fabric that connects to your external array. e. Connect one end of an Ethernet cable to NIC2. Connect the other end of the cable to port 2 of Switch 2824 (see Figure 10). f. Connect one end of a USB cable to the USB port. Connect the other end of the cable to the USB/Ethernet adapter. Connect an Ethernet cable to the Ethernet end of the adapter, then connect the Ethernet cable to port 2 of Switch 2524 (see Figure 11). g. Connect a power cable to each power supply on the node and to a PDU. If possible, connect to separate PDUs to provide redundancy. h. Continue routing the cables through the cable ties that shipped with the racks. 32 Hardware installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180

j.
Begin routing the cables through the cable ties that shipped with the racks.
2.
On the secondary node(s) of the VLS300:
NOTE:
Use this procedure to install any secondary node—node 1 which is shipped with the
gateway or upgrade nodes 2–7 which can be ordered separately.
11153
5
6
7
8
1
2
3
4
1
Dual port FC card, host port, port 0
2
Dual port FC card, host port, port 1
3
Dual port FC card, storage port, port 3
4
Dual port FC card, storage port, port 2
5
NIC2, on secondary nodes connects to the next available port of switch 2824
6
USB port, connects to USB/Ethernet adapter
7
Power supply 2
8
Power supply 1
Figure 9 Secondary node ports
a.
Connect one end of an FC cable (not provided) to host port 0. Connect the other end to an
external FC switch/fabric that connects to your tape backup hosts.
b.
If desired, connect one end of an FC cable (not provided) to host port 1. Connect the other end
to an external FC switch/fabric that connects to your tape backup hosts. Otherwise, connect a
loopback plug to host port 1.
c.
Connect one end of an FC cable (not provided) to device port 3. Connect the other end to an
external FC switch/fabric that connects to your external array.
d.
Connect one end of an FC cable (not provided) to device port 2. Connect the other end to a
second external FC switch/fabric that connects to your external array.
e.
Connect one end of an Ethernet cable to NIC2. Connect the other end of the cable to port
2 of Switch 2824 (see
Figure 10
).
f.
Connect one end of a USB cable to the USB port. Connect the other end of the cable to the
USB/Ethernet adapter. Connect an Ethernet cable to the Ethernet end of the adapter, then
connect the Ethernet cable to port 2 of Switch 2524 (see
Figure 11
).
g.
Connect a power cable to each power supply on the node and to a PDU. If possible, connect to
separate PDUs to provide redundancy.
h.
Continue routing the cables through the cable ties that shipped with the racks.
32
Hardware installation