HP StorageWorks 300 HP StorageWorks 300 Virtual Library System user guide (AH1 - Page 47
Operation, Powering on the VLS300 system, Rebooting the system
View all HP StorageWorks 300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 47 highlights
5 Operation This section describes how to power on and power off the VLS nodes. It is comprised of the following topics: • Powering on the VLS300 system • Rebooting the system • Powering off the system Powering on the VLS300 system To power on the VLS300 system: 1. Power on all arrays connected to the VLS300. 2. Power on the two private LAN switches connected to the VLS300. 3. Plug the VLS300 nodes' AC power cords into a power source if not already connected. 4. Press the VLS300 secondary nodes' Power On/Standby button. After the secondary nodes are powering up, press the primary node's Power On/Standby button. See Front panel LEDs and buttons. 5. Confirm that the VLS components are all functioning normally and the VLS is cabled correctly by observing the condition of their status LEDs. 6. Rebooting the system is complete when you receive the "Initializing node#", then "Initializing for node# completed." messages for all nodes in the systems notifications. Rebooting the system To reboot the system: To reboot from VLS CLI: 1. Verify that any backup or restore operation has completed and that the VLS is idle. 2. Open a secure shell session and log in as the administrator. See Opening a secure shell session. 3. Initiate a reboot of the VLS by entering: restartSystem To reboot from Command View VLS: 1. Verify that any backup or restore operation has completed and that the VLS is idle. 2. Open a Command View VLS session and log in as the administrator. See Opening a Command View VLS session from a web browser. 3. Under the System tab, select Chassis in the navigation tree. 4. Under Maintenance Tasks, select System Maintenance. 5. Select Restart All Nodes from the task bar. Restart Head Wizard displays (Figure 22). HP StorageWorks 47