HP StorageWorks 300 HP StorageWorks 300 Virtual Library System user guide (AH1 - Page 34

Switch 2524 ports, Ensure that the Ethernet cable from port 24 of Switch 2524 is

Page 34 highlights

123 456 26 78 1 Ethernet cable from USB adapter on primary node 2 Ethernet cable from USB adapter on 2nd node 3 Ethernet cable from USB adapter on 3rd node (if present) 4 Ethernet cable from USB adapter on 4th node (if present) 5 Ethernet cable from USB adapter on 5th node (if present) 6 Ethernet cable from USB adapter on 6th node (if present) 7 Ethernet cable from USB adapter on 7th node (if present) 8 Ethernet cable from USB adapter on 8th node (if present) 9 Ethernet cable from port 24 of switch 2824 8 11146 Figure 11 Switch 2524 ports a. Ensure that the power cable is connected to the switch, as described in the racking instructions (see Installing the VLS node(s) into a rack). b. Ensure that the Ethernet cables from the NIC2 ports of each node are firmly set in the appropriate ports on the switch. c. Ensure that the Ethernet cable from port 24 of Switch 2524 is firmly connected to port 24 of Switch 2824. d. Route the power cable through the holes in the rack to the back of the rack, then connect the cable to a PDU. e. Finish routing the cables through the cable ties that shipped with the racks. The VLS300 system hardware installation is complete. Continue installation by configuring the identities of each node. 34 Hardware installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180

26
11146
1
2
3
4
5
6
7
8
8
1
Ethernet cable from USB adapter on primary node
2
Ethernet cable from USB adapter on 2nd node
3
Ethernet cable from USB adapter on 3rd node (if present)
4
Ethernet cable from USB adapter on 4th node (if present)
5
Ethernet cable from USB adapter on 5th node (if present)
6
Ethernet cable from USB adapter on 6th node (if present)
7
Ethernet cable from USB adapter on 7th node (if present)
8
Ethernet cable from USB adapter on 8th node (if present)
9
Ethernet cable from port 24 of switch 2824
Figure 11 Switch 2524 ports
a.
Ensure that the power cable is connected to the switch, as described in the racking instructions
(see
Installing the VLS node(s) into a rack
).
b.
Ensure that the Ethernet cables from the NIC2 ports of each node are
rmly set in the
appropriate ports on the switch.
c.
Ensure that the Ethernet cable from port 24 of Switch 2524 is
rmly connected to port 24
of Switch 2824.
d.
Route the power cable through the holes in the rack to the back of the rack, then connect
the cable to a PDU.
e.
Finish routing the cables through the cable ties that shipped with the racks.
The VLS300 system hardware installation is complete. Continue installation by con
guring the identities
of each node.
34
Hardware installation