HP Surestore Tape Library Model 10/180 HP Surestore Bridge FC 2/1 LV and FC 4/ - Page 16
Operation Indicators, for SCSI Bus 1.
View all HP Surestore Tape Library Model 10/180 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Operation Indicators The bridge is equipped with back panel LED indicators for monitoring overall status. Figure 6 HP Surestore Bridge FC 2/1 LV LED Indicators The LED functionality of the FC 2/1 LV is as follows: ■ Power - This green indicator turns on when power is applied to the bridge. ■ Fault - This green indicator illuminates during power-on self test (POST), then remains dark unless the bridge experiences a processor problem. ■ Fibre Channel - This green indicator signifies Fibre Channel activity when lit. ■ Ethernet - This green indicator signifies Ethernet activity when lit. ■ Bus 0 - This green indicator signifies SCSI 0 activity when lit. ■ SCSI Bus 1 - This green indicator signifies SCSI 1 activity when lit. ■ Term 0 - This green indicator signifies internal SCSI termination is enabled for SCSI Bus 0. ■ Term 1 - This green indicator signifies internal SCSI termination is enabled for SCSI Bus 1. 18 Operation Indicators Chapter 1