IBM 7945E2U User Manual - Page 145
Press the posts into the rings and underneath the tabs on the remote
View all IBM 7945E2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 145 highlights
12. Install the battery on the remote battery tray: a. Connect the battery carrier cable to the battery, if it is not already connected. b. On the remote battery tray, find the pattern of recessed rings that matches the posts on the battery and battery carrier. c. Press the posts into the rings and underneath the tabs on the remote battery tray. d. Secure the battery to the tray with the battery retention clip. 13. Route the remote battery cable. Attention: Make sure that the cable is not pinched and does not cover any connectors or obstruct any components on the system board. Chapter 2. Installing optional devices 129
12.
Install the battery on the remote battery tray:
a.
Connect the battery carrier cable to the battery, if it is not already
connected.
b.
On the remote battery tray, find the pattern of recessed rings that matches
the posts on the battery and battery carrier.
c.
Press the posts into the rings and underneath the tabs on the remote
battery tray.
d.
Secure the battery to the tray with the battery retention clip.
13.
Route the remote battery cable.
Attention:
Make sure that the cable is not pinched and does not cover any
connectors or obstruct any components on the system board.
Chapter 2. Installing optional devices
129