IBM 7945E2U User Manual - Page 155

Completing the installation, Rack Installation Instructions

Page 155 highlights

Release tab DVD drive filler panel 4. Attach the drive-retention clip to the side of the drive. 5. Slide the drive into the DVD drive bay until the drive clicks into place. If you have other devices to install or remove, do so now. Otherwise, go to "Completing the installation." Completing the installation To complete the installation, complete the following steps: 1. If you removed the microprocessor 2 air baffle, replace the microprocessor 2 air baffle (see "Installing the microprocessor 2 air baffle" on page 48 ). 2. If you removed the DIMM air baffle, install it (see "Installing the DIMM air baffle" on page 50). 3. If you removed either of the PCI riser-card assemblies, replace the riser-card assemblies (see "Installing a PCI riser-card assembly" on page 46). 4. If you removed the server cover, replace it (see "Replacing the server cover" on page 140). 5. Install the server in a rack. See the Rack Installation Instructions that come with the server for complete rack installation and removal instructions. 6. To attach peripheral devices and connect the power cords, see "Connecting the external cables" on page 141. Chapter 2. Installing optional devices 139

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194

DVD drive filler panel
Release tab
4.
Attach the drive-retention clip to the side of the drive.
5.
Slide the drive into the DVD drive bay until the drive clicks into place.
If you have other devices to install or remove, do so now. Otherwise, go to
“Completing the installation.”
Completing the installation
To complete the installation, complete the following steps:
1.
If you removed the microprocessor 2 air baffle, replace the microprocessor 2 air
baffle (see “Installing the microprocessor 2 air baffle” on page 48 ).
2.
If you removed the DIMM air baffle, install it (see “Installing the DIMM air baffle”
on page 50).
3.
If you removed either of the PCI riser-card assemblies, replace the riser-card
assemblies (see “Installing a PCI riser-card assembly” on page 46).
4.
If you removed the server cover, replace it (see “Replacing the server cover” on
page 140).
5.
Install the server in a rack. See the
Rack Installation Instructions
that come with
the server for complete rack installation and removal instructions.
6.
To attach peripheral devices and connect the power cords, see “Connecting the
external cables” on page 141.
Chapter 2. Installing optional devices
139