HP rp5400 User Guide - HP rp5400 Family of Servers - Page 229
Index, Configuring the GSP LAN Port via an ASCII console
View all HP rp5400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 229 highlights
Index A Accessing Error Chassis Logs, 98 Acoustic Safety Standards, 248 Adding Users, 71, 80, 83 Additional Components, 22 Altitude Operation Standards, 249 Effects of Altitude, 249 C Cabinet Performance Grounding (High Frequency Ground), 255 Changing the Default GSP Configuration, 82, 85 Chassis Code to FRU Decode, 93 Computer Room Physical Space Requirements, 243 Aisle Space, 243 Server, 243 Computer Room Unpacking Space, 244 Configure Remote Console, 60 Configure RS-232 Console, 56 Configure System Consoles, 55 Configure the LAN Console, 61 Configure the Web Console, 63 Configuring the GSP LAN Port, 80, 83 Configuring the GSP LAN Port via an ASCII console, 61 Configuring the Rev A Guardian Service Processor (GSP), 80 Configuring the Rev B Guardian Service Processor (GSP), 83 Core I/O Connections, 50 Core I/O Removal, 146 Core I/O Replacement, 147 CPU Removal, 182 CPU Socket Replacement, Cleaning, and CPU Replacement, 183 Cleaning Kit Components, 183 CPU Cleaning for System Board Replacement, 185, 186 Replacing the CPU, 187 Tools Required, 183 Cross-Referencing Chassis Log Errors to rp54xx FRUs, 93 CRU Physical Location, 216 Customer Replaceable Unit Part Numbers, 219 D Data Communications Cables, 257 Determine Current System State, 88 Dimensions, 242 Disk Media Backplane Removal, 212 Disk Media Backplane Replacement, 213 Disk Media Housing Removal, 188 Disk Media Housing Replacement, 189 Display Board Removal, 173, 174 Removing rp5400 and/or rp5450 Model Platform Monitors, 175 Removing The rp5470 Model Platform Monitor, 175 E Electrical, 245 Modular PDUs, 246 Office High Availability Requirements, 245 Server-level Enhanced Power Availability, 245 Power Protection, 245 System Power Requirements, 246 electrical and environmental guidelines electrical conduit ground, 255 electrostatic discharge prevention, 248 lighting requirements, 252 main building electrical ground, 255 power panel grounds, 255 Electrical Conduit Ground, 255 electrical load requirements, 253 Environment Elements Acoustics, 262 Environmental Elements, 258 Computer Room Preparation, 258 Cooling Requirements, 258 Air Conditioning Ducts, 260 Air Conditioning System Guidelines, 259 Air Conditioning System Installation, 260 Air Conditioning System Types, 259 Basic Air Conditioning Equipment Requirements, 258 Basic Air Distribution Systems, 259 Delivery Survey, 272 Dust and Pollution Control, 260 Electrostatic Discharge (ESD) Prevention, 262 Facility Characteristics, 263 Floor Loading, 263 Average Floor Loading, 264 Floor Loading Terms, 263 Raised Floor Loading, 263 Typical Raised Floor Site, 264 Windows, 265 Humidity Level, 260 Metallic Particulate Contamination, 261 Site Inspection, 268 Space Requirements, 266 Delivery Space Requirements, 266 Floor Plan Grid, 266 Operational Space Requirements, 266 Typical Installation Schedule, 267 Equipment Grounding Implementation Details, 257 Example of Accessing Error Logs, 98 Expansion I/O LED States, 116 Extend the Server out the Front, 133 F Factory Integrated Cabinet Installation, 2 Fan, Power Supply, and Disk LED States, 121 Field Replaceable Unit Part Numbers, 235 Front Bezel Removal (Single Piece), 142 Front Bezel Removal (Two Piece), 144 Front Bezel Replacement (Single Piece), 143 Front Bezel Replacement (Two Piece), 145 FRU Physical Location, 221 G Graphics Troubleshooting, 46 grounding systems 213