Acer AB460 F1 User Manual - Page 568
Acer 4X QDR InfiniBand Switch Module
View all Acer AB460 F1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 568 highlights
548 4 Networking Switch Modules Note: The 10GbE module also requires the same double-wide bay as the InfiniBand switch module and may be installed instead of the InfiniBand switch module in your blade enclosure system. Use the same instructions below for installing either the pass-through module or the InfiniBand switch module. Installing the Module 1. Remove the dummy cover from the bay you want to place the module in. 2. Place the module's release handle in the open position. 3. Slide the module into the module bay until it stops. 4. Push the release handle to the closed position. After the module has been installed and the handle locked, it will power on after a short delay and a POST test will run to verify it is working properly. Removing the Module 1. Pull out the release handle to the open position. 2. Pull the module out of the bay. 3. Replace immediately with another module or with a dummy module cover to maintain airflow integrity. Acer 4X QDR InfiniBand Switch Module Figure 4-224. InfiniBand Switch Module 2 6 3 5 RESET CMM NA / NA 1 / 2 3 / 4 71 6 5 / 6 7 / 8 9 / 10 4 11 / 12 13 / 14 15 / 16