Cisco 2948G Hardware Installation Guide - Page 54

Class A Notice for Hungary, Checking the Shipping Container, Catalyst 2948G and 2980G Switches

Page 54 highlights

Preparing for Installation Class A Notice for Hungary Chapter 3 Installing the Switch Warning This equipment is a class A product and should be used and installed properly according to the Hungarian EMC Class A requirements (MSZEN55022). Class A equipment is designed for typical commercial establishments for which special conditions of installation and protection distance are used. Checking the Shipping Container Do not discard the packing carton and other packing materials after you unpack the switch. Flatten the packing carton and store it. You will need the packing materials if you need to move or ship the switch in the future. Repacking instructions are provided in Appendix B, "Repacking a Switch." Check the contents of the accessory kit against the accessories checklist and the packing slip. Verify that you received all listed equipment. Catalyst 2948G and 2980G Switches The Catalyst 2948G and 2980G switches are shipped with these items: • This hardware guide • AC power cord • RJ-45 to DB-9 cable • DB-9 to RJ-45 cable Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide 3-4 78-6286-05

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142

Chapter 3
Installing the Switch
Preparing for Installation
3-4
Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide
78-6286-05
Class A Notice for Hungary
Checking the Shipping Container
Do not discard the packing carton and other packing materials after you unpack
the switch. Flatten the packing carton and store it. You will need the packing
materials if you need to move or ship the switch in the future. Repacking
instructions are provided in
Appendix B, “Repacking a Switch.”
Check the contents of the accessory kit against the accessories checklist and the
packing slip. Verify that you received all listed equipment.
Catalyst 2948G and 2980G Switches
The Catalyst 2948G and 2980G switches are shipped with these items:
This hardware guide
AC power cord
RJ-45 to DB-9 cable
DB-9 to RJ-45 cable
Warning
This equipment is a class A product and should be used and installed properly
according to the Hungarian EMC Class A requirements (MSZEN55022). Class A
equipment is designed for typical commercial establishments for which
special conditions of installation and protection distance are used.