Compaq ProLiant 5500 Compaq ProLiant 5500 Setup and Installation Guide Pentium - Page 35
Pre-Installation Planning, Power Requirements
![]() |
View all Compaq ProLiant 5500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
2-3 Pre-installation Planning This section discusses the power, grounding, and temperature requirements of the Compaq ProLiant 5500 server. Power Requirements WARNING: To reduce the risk of personal injury, fire, or damage to the equipment, do not overload the AC supply branch circuit that provides power to the server. Consult the electrical authority having jurisdiction over your facility wiring and installation requirements. s The power load needs to be balanced between available AC supply branch circuits. s The overall system AC current load must not exceed 80 percent of the branch circuit AC current rating. s If power strips are used, the load should not exceed 80 percent of the power strip's marked electrical current rating. The installation of this equipment shall be in accordance with Local/Regional electrical regulations governing the installation of Information Technology Equipment by licensed electricians. This equipment is designed to operate in installations covered by the National Electric Code (ANSI/NFPA 70, 1993) and the code for Protection of Electronic Computer/Data Processing Equipment (NFPA-75, 1992). Compaq ProLiant 5500 Servers Setup and Installation Guide For use with Intel Pentium II Xeon processor-based servers only
![](/manual_guide/products/compaq-proliant-5500-compaq-proliant-5500-setup-installation-guide-pentium-ii-xeon-processorbased-servers-eeb44d9/35.png)