Compaq ProLiant 5500 Compaq ProLiant 5500 Setup and Installation Guide Pentium - Page 47
Preparing the Mounting Brackets and Slide Rail Assemblies
![]() |
View all Compaq ProLiant 5500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 47 highlights
3-8 Rack-Mount Server Installation s Slotted screwdriver s Application software diskettes, such as SmartStart and Support Software s Options to be installed, such as t Optional monitor, keyboard, etc. t Integrated Management Display (tower model only) t Array Controller t Redundant fans Preparing the Mounting Brackets and Slide Rail Assemblies Each pair of mounting brackets, with attached slide rail assemblies supports one rack-mountable server. Figure 3-2. Rack mounting brackets; alignment tabs identify the front flanges Each slide rail assembly consists of an outer bracket rail and an inner server rail (see the following figure). These pieces can be separated; the bracket rails attach to the rack mounting brackets (shown in the previous figure), and the server rails attach to the sides of the server chassis. For use with Intel Pentium II Xeon processor-based servers only
![](/manual_guide/products/compaq-proliant-5500-compaq-proliant-5500-setup-installation-guide-pentium-ii-xeon-processorbased-servers-eeb44d9/47.png)