Compaq ProLiant 5500 Compaq ProLiant 5500 Setup and Installation Guide Pentium - Page 61
Loading the Rack Server, WARNING, IMPORTANT
View all Compaq ProLiant 5500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 61 highlights
3-22 Rack-Mount Server Installation Loading the Rack Server Load and secure the server to the rack with the face plate thumbscrews before continuing to attach any more mounting bracket assemblies. Ensure that this pair of brackets is perfectly aligned and installed and that the server fits before you continue. WARNING: To reduce the risk of personal injury or damage to the equipment, a minimum of two people MUST lift the server into the rack. The server weighs in excess of 92 lb (41.8 kg). If the unit is to be loaded above chest level, a third person must assist in aligning the rails while the other two support the unit. IMPORTANT: To make the server lighter and more manageable, do not install drives in the server until after you load the server into the rack. You may also temporarily remove power supplies and reinstall them after you have mounted the server in the rack. For use with Intel Pentium II Xeon processor-based servers only