Compaq ProLiant 5500 Compaq ProLiant 5500 Setup and Installation Guide Pentium - Page 55

Inserting Cage Nuts in the Rack Frame, of the rails at

Page 55 highlights

3-16 Rack-Mount Server Installation Figure 3-8. Measuring with the template 3. After marking the front of the rack, flip the template over and mark the back rails of the rack. Open the rear door of the rack to access the back rails. 4. On the back of the rack, also mark the rail to show the top of the template. This will help you align a template for the next server. Inserting Cage Nuts in the Rack Frame After marking the positions for the fasteners in both the front and back of the rack, use the fitting tool to insert cage nuts on the inside of the rails at the marked locations. The cage nuts and fitting tool are included in the hardware kit supplied with the rack. 1. Position the cage nut as shown in the following figure, on the inside of the rail. 2. Hook one of the lips of the cage nut through the square rail perforation. For use with Intel Pentium II Xeon processor-based servers only

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159

3-16
Rack-Mount Server Installation
For use with Intel Pentium II Xeon processor-based servers only
Figure 3-8.
Measuring with the template
3.
After marking the front of the rack, flip the template over and mark the
back rails of the rack. Open the rear door of the rack to access the back
rails.
4.
On the back of the rack, also mark the rail to show the top of the
template. This will help you align a template for the next server.
Inserting Cage Nuts in the Rack Frame
After marking the positions for the fasteners in both the front and back of the
rack, use the fitting tool to insert cage nuts on the
inside
of the rails at the
marked locations. The cage nuts and fitting tool are included in the hardware kit
supplied with the rack.
1.
Position the cage nut as shown in the following figure, on the inside of
the rail.
2.
Hook one of the lips of the cage nut through the square rail perforation.