3-10 Rack-Mount Server Installation Figure 3-4. Removing the server rail from the bracket rail 2. Put the server rails to one side. You will attach them to the rack server chassis later, in the section, "Attaching Server Rails." The next figure shows the separated bracket rail with its inner sliding piece and the flat, one-piece server rail. Figure 3-5. Separated bracket rail (top) and server rail For use with Intel Pentium II Xeon processor-based servers only
![](/manual_guide/products/compaq-proliant-5500-compaq-proliant-5500-setup-installation-guide-pentium-ii-xeon-processorbased-servers-eeb44d9/49.png)
3-10
Rack-Mount Server Installation
For use with Intel Pentium II Xeon processor-based servers only
Figure 3-4.
Removing the server rail from the bracket rail
2.
Put the server rails to one side. You will attach them to the rack server
chassis later, in the section, "Attaching Server Rails.”
The next figure shows the separated bracket rail with its inner sliding piece and
the flat, one-piece server rail.
Figure 3-5.
Separated bracket rail (top) and server rail