Compaq ProLiant 5500 Compaq ProLiant 5500 Setup and Installation Guide Pentium - Page 54

IMPORTANT, server's face plate to the front of the rack.

Page 54 highlights

3-15 IMPORTANT: The template is two-sided (front and back) and printed with arrows that show you where the screws will be inserted, both for the mounting bracket assemblies and for the thumbscrews that will secure the server's face plate to the front of the rack. Align the template carefully with the holes on the rack, to determine the exact placement of the screws. 2. When you mark the positioning of the mounting bracket screws, also mark the positioning in the front of the rack for the cage nuts. These are two slots marked "C" on the template. The cage nuts will hold the thumbscrews through the server's face plate. Be sure to follow the alignment instructions on the template, and keep the sides of the template squared up with the sides of the rack. Tick marks on the rack's vertical rails will help you maintain the proper alignment. Compaq ProLiant 5500 Servers Setup and Installation Guide For use with Intel Pentium II Xeon processor-based servers only

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159

3-15
Compaq ProLiant 5500 Servers Setup and Installation Guide
For use with Intel Pentium II Xeon processor-based servers only
IMPORTANT:
The template is two-sided (front and back) and printed with
arrows that show you where the screws will be inserted, both for the
mounting bracket assemblies and for the thumbscrews that will secure the
server's face plate to the front of the rack.
Align the template carefully with the holes on the rack, to determine the
exact placement of the screws.
2.
When you mark the positioning of the mounting bracket screws, also
mark the positioning in the front of the rack for the cage nuts. These are
two slots marked "C" on the template. The cage nuts will hold the
thumbscrews through the server's face plate.
Be sure to follow the alignment instructions on the template, and keep
the sides of the template squared up with the sides of the rack. Tick
marks on the rack’s vertical rails will help you maintain the proper
alignment.