D-Link DSN-6410 User Manual for DSN-6410 - Page 25
Install battery backup module
View all D-Link DSN-6410 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
BBM Status Button: When the system power is off, press the BBM status button, if the BBM LED is Green, then the BBM still has power to keep data on the cache. If not, then the BBM power is ran out and cannot keep the data on the cache anymore. Management port. Console port. RS 232 port for UPS. SAS JBOD expansion port. 2.4 Install battery backup module To install the IP SAN storage with a battery backup module, please follow the procedure. Figure 2.4.1 1. BBM (Battery Backup Module) supports hot pluggable. Regardless of the IP SAN storage is turned on or off. 2. Remove the cover of BBM. 3. Insert the BBM. 4. Tighten the BBM and use screws to lock the both sides. 5. Done. 25
25
BBM Status Button:
When the system power is off, press the BBM status button,
if the BBM LED is Green, then the BBM still has power to
keep data on the cache. If not, then the BBM power is ran
out and cannot keep the data on the cache anymore.
Management port.
Console port.
RS 232 port for UPS.
SAS JBOD expansion port.
2.4
Install battery backup module
To install the IP SAN storage with a battery backup module, please follow the procedure.
Figure 2.4.1
1.
BBM (Battery Backup Module) supports hot pluggable. Regardless of the IP SAN
storage is turned on or off.
2.
Remove the cover of BBM.
3.
Insert the BBM.
4.
Tighten the BBM and use screws to lock the both sides.
5.
Done.