HP ProLiant DL185 HP Insight Server Migration Software for ProLiant User Guide - Page 53

Previous, Launch iLO, Cancel Booting, Test network connections

Page 53 highlights

The Next and Previous buttons are disabled during the reboot. To view the booting process of the destination server, click Launch iLO, and then open the remote console. To cancel the boot process and power down the destination server, click Cancel Booting. 6. The Next and Previous buttons are disabled during the reboot. To view the booting process of the destination server, click Launch iLO, and then open the remote console. To cancel the boot process and power down the destination server, click Cancel Booting. 7. Test the network connections and latency between the source-to-destination server and the application-station-to-destination server. The results of a 2-second test initially appear. 8. To perform additional tests, select a test time in the Test network connections section, and then click Test. The following test times are available: • 2 seconds • 5 seconds • 10 seconds • 30 seconds • 60 seconds If the source-to-destination or application-station-to-destination connection cannot be established, the Next button is disabled. Ensure that ports 51125 and 51126 are open between source and destination servers. If the source-to-destination or application-station-to-destination connection is established but the network test reports a transfer speed below 250 kbps, the Next button is disabled. If the source-to-destination or application-station-to-destination connection is established and the network test reports a transfer speed of at least 250 kbps, the Next button is enabled. CAUTION: If the application-station-to-destination latency is less than 125 milliseconds, continue with the migration. Latency exceeding 125 milliseconds during driver installation might cause the driver installation to fail. Before continuing with the migration, verify the proper duplex setting, and then check the latency again. 9. Click Next. Physical-to-ProLiant (P2P) migrations for Windows 53

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147

The
Next
and
Previous
buttons are disabled during the reboot. To view the booting process of the
destination server, click
Launch iLO
, and then open the remote console.
To cancel the boot process and power down the destination server, click
Cancel Booting
.
6.
The
Next
and
Previous
buttons are disabled during the reboot. To view the booting process of the
destination server, click
Launch iLO
, and then open the remote console.
To cancel the boot process and power down the destination server, click
Cancel Booting
.
7.
Test the network connections and latency between the source-to-destination server and the
application-station-to-destination server. The results of a 2-second test initially appear.
8.
To perform additional tests, select a test time in the
Test network connections
section, and then click
Test
. The following test times are available:
2 seconds
5 seconds
10 seconds
30 seconds
60 seconds
If the source-to-destination or application-station-to-destination connection cannot be established, the
Next
button is disabled. Ensure that ports 51125 and 51126 are open between source and destination
servers.
If the source-to-destination or application-station-to-destination connection is established but the network
test reports a transfer speed below 250 kbps, the
Next
button is disabled.
If the source-to-destination or application-station-to-destination connection is established and the network
test reports a transfer speed of at least 250 kbps, the
Next
button is enabled.
CAUTION:
If the application-station-to-destination latency is less than 125 milliseconds, continue with
the migration. Latency exceeding 125 milliseconds during driver installation might cause the driver
installation to fail. Before continuing with the migration, verify the proper duplex setting, and then check
the latency again.
9.
Click
Next
.
Physical-to-ProLiant (P2P) migrations for Windows
53