HP StorageWorks 2/128 HP StorageWorks SAN Director 2/128 Installation Guide, V - Page 30

Time and Items Required, Table 4: SAN Director 2/128 Installation Tasks, Estimated Time

Page 30 highlights

Installing and Configuring the SAN Director 2/128 Time and Items Required Table 4 describes the main installation and setup tasks and the estimated time required for each task based on a fully populated SAN Director 2/128 switch (128 Fibre Channel ports). Configurations containing fewer than 128 ports require less time. These time estimates assume a prepared installation site and appropriate power and network connectivity. Table 4: SAN Director 2/128 Installation Tasks, Estimated Time, and Items Required Installation Task Unpacking switch Installing switch in the 14U Rack Mount Kit supplied with the switch Installing power cables and serial cable and configuring IP addresses Time Estimate 30 minutes 45 minutes 20 minutes Items Required 1/2-inch socket wrench (to remove pallet bolts) #2 Phillips screwdriver (for cable management tray) Pallet jack Hydraulic lift or assisted lift, able to raise to a minimum of 55 inches (140 cm), with a minimum capacity of 212 lbs (96 kg). HP StorageWorks SAN Director 2/128 Installation Guide, part number AA-RVUSA-TE (this guide) Power cables and serial cable (provided in SAN Director 2/128 accessory kit) Workstation computer with a serial port or terminal server port and a terminal emulator application (such as HyperTerminal) Ethernet IP addresses for the switch (1) and for each CP card (2): total three addresses 30 SAN Director 2/128 Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202

Installing and Configuring the SAN Director 2/128
30
SAN Director 2/128 Installation Guide
Time and Items Required
Table 4
describes the main installation and setup tasks and the estimated time
required for each task based on a fully populated SAN Director 2/128 switch (128
Fibre Channel ports). Configurations containing fewer than 128 ports require less
time. These time estimates assume a prepared installation site and appropriate
power and network connectivity.
Table 4:
SAN Director 2/128 Installation Tasks, Estimated Time, and Items Required
Installation Task
Time Estimate
Items Required
Unpacking switch
30 minutes
1/2-inch socket wrench (to remove
pallet bolts)
#2 Phillips screwdriver
(for cable management tray)
Pallet jack
Hydraulic lift or assisted lift, able to
raise to a minimum of 55 inches
(140 cm), with a minimum capacity of
212 lbs (96 kg).
Installing switch in the 14U Rack
Mount Kit supplied with the switch
45 minutes
HP StorageWorks SAN Director 2/128
Installation Guide
, part number
AA-RVUSA-TE (this guide)
Installing power cables and serial
cable and configuring IP addresses
20 minutes
Power cables and serial cable (provided
in SAN Director 2/128 accessory kit)
Workstation computer with a serial port
or terminal server port and a terminal
emulator application (such as
HyperTerminal)
Ethernet IP addresses for the switch (1)
and for each CP card (2): total three
addresses