Connect the power cords to a power source with voltage of 200 to 240 VAC
View all HP StorageWorks 2/128 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 59 highlights
Installing and Configuring the SAN Director 2/128 6. Ensure that the power cord has a minimum service loop of 6 inches available at the connection to the switch and is routed so that it is not exposed to stress. 7. Connect the power cords to a power source with voltage of 200 to 240 VAC, 50 to 60 Hz. 8. Position AC power switches to "1." The AC power switches light up green when switched on and power is supplied. Note: The switch automatically performs a power-on self-test (POST) by default each time it is powered on. POST takes approximately 10 minutes and is complete when indicator light activity returns to its standard state. For information about LED patterns, see "Interpreting LED Activity" on page 82). Caution: To prevent a potential IP address conflict, do not connect the SAN Director 2/128 to the network until the IP addresses are configured. See "Initial Configuration Parameters" on page 67 for additional information. SAN Director 2/128 Installation Guide 59