HP StorageWorks 2/128 HP StorageWorks SAN Director 2/128 Installation Guide, V - Page 59

Connect the power cords to a power source with voltage of 200 to 240 VAC

Page 59 highlights

Installing and Configuring the SAN Director 2/128 6. Ensure that the power cord has a minimum service loop of 6 inches available at the connection to the switch and is routed so that it is not exposed to stress. 7. Connect the power cords to a power source with voltage of 200 to 240 VAC, 50 to 60 Hz. 8. Position AC power switches to "1." The AC power switches light up green when switched on and power is supplied. Note: The switch automatically performs a power-on self-test (POST) by default each time it is powered on. POST takes approximately 10 minutes and is complete when indicator light activity returns to its standard state. For information about LED patterns, see "Interpreting LED Activity" on page 82). Caution: To prevent a potential IP address conflict, do not connect the SAN Director 2/128 to the network until the IP addresses are configured. See "Initial Configuration Parameters" on page 67 for additional information. SAN Director 2/128 Installation Guide 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202

Installing and Configuring the SAN Director 2/128
59
SAN Director 2/128 Installation Guide
6.
Ensure that the power cord has a minimum service loop of 6 inches available
at the connection to the switch and is routed so that it is not exposed to stress.
7.
Connect the power cords to a power source with voltage of 200 to 240 VAC,
50 to 60 Hz.
8.
Position AC power switches to “1.” The AC power switches light up green
when switched on and power is supplied.
Note:
The switch automatically performs a power-on self-test (POST) by default each
time it is powered on. POST takes approximately 10 minutes and is complete when
indicator light activity returns to its standard state. For information about LED patterns,
see °
Interpreting LED Activity
± on page 82).
Caution:
To prevent a potential IP address conflict, do not connect the SAN
Director 2/128 to the network until the IP addresses are configured. See
°
Initial Configuration Parameters
± on page 67 for additional information.