HP StorageWorks 2/128 HP StorageWorks SAN Director 2/128 Installation Guide, V - Page 58
AC panel and power cord retainers
![]() |
View all HP StorageWorks 2/128 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 58 highlights
Installing and Configuring the SAN Director 2/128 2. Verify that the AC switch covers are installed over the AC switches. These clear plastic covers fit over the AC switches with their edges tucked underneath the outlet covers, preventing the AC switches from being powered on or off accidentally (see Figure 12). 3. Connect the AC power cord retainers to the chassis: orient a retainer against the AC panel as shown in Figure 12. Place the retainer tabs under the two jack screws on either side of the power receptacle and tighten the screws. 4. Repeat for the other retainer (note that the power cord retainers are oriented in the same direction as the power receptacles). AC Power Receptacle (2x) Jack Screw (2x) Clamping Screw POWER S AC Switch (2x) POWER SUPPLY 1 & 3 200-240 VAC 12A 50-60 Hz Clamping Screw ! POWER SUPPLY 2 & 4 200-240 VAC 12A 50-60 Hz AC Switch Cover (2x) Power Cord Retainer (2x) Retainer Attaching Screw (2x) scale: 5/16" = 1" 2.014 Figure 12: AC panel and power cord retainers 5. Loosen the clamping screw on each retainer, insert the power cords through the retainers into the power receptacles on the SAN Director 2/128, and tighten the clamping screws. The power cords are designed with left bends, so each should route to opposite sides of the chassis. 58 SAN Director 2/128 Installation Guide
![](/manual_guide/products/hewlettpackard-storageworks-2128-hp-storageworks-san-director-2128-installation-guide-v42x-aarvusbte-2004-deadb4a/58.png)