HP StorageWorks 2/128 HP StorageWorks SAN Director 2/128 Installation Guide, V - Page 99

Boot, Fabric is analyzed. If any ports are connected to other switches, the switch

Page 99 highlights

Boot Operating the SAN Director 2/128 ■ Diagnostic tests are run on several functions, including circuitry, port functionality, ability to send and receive frames, all aspects of memory, parity, statistics counters, and serialization. Boot completes in a minimum of three minutes if POST is run. In addition to POST, boot includes the following steps after POST is complete: ■ Universal port configuration is performed. ■ Links are initialized. ■ Fabric is analyzed. If any ports are connected to other switches, the switch participates in a fabric configuration. ■ The switch obtains a domain ID and assigns port addresses. ■ Unicast routing tables are constructed. ■ Normal port operation is enabled. SAN Director 2/128 Installation Guide 99

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202

Operating the SAN Director 2/128
99
SAN Director 2/128 Installation Guide
Diagnostic tests are run on several functions, including circuitry, port
functionality, ability to send and receive frames, all aspects of memory, parity,
statistics counters, and serialization.
Boot
Boot completes in a minimum of three minutes if POST is run. In addition to
POST, boot includes the following steps after POST is complete:
Universal port configuration is performed.
Links are initialized.
Fabric is analyzed. If any ports are connected to other switches, the switch
participates in a fabric configuration.
The switch obtains a domain ID and assigns port addresses.
Unicast routing tables are constructed.
Normal port operation is enabled.