Intel SPSH4 Product Guide - Page 29
Getting Started, Selecting a Site, Space and Power Requirements
![]() |
UPC - 735858156462
View all Intel SPSH4 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 29 highlights
3 Getting Started This section discusses the main steps you need to perform to get your server up and running: 1. Select an appropriate site. 2. Install processors, memory, hard disk drives, and other options. 3. Connect the monitor, keyboard, and mouse. 4. Turn on the server and boot to the System Resource CD-ROM. 5. Configure the system with the FRU/SDR load utility. 6. Install the service partition (optional). 7. Install an operating system. 8. Set up system security. 9. Install the server into a rack unit (rack-mount version only). Selecting a Site This section describes the space and power requirements and general site criteria for installing the server. Space and Power Requirements The server is available in both rack-mount and pedestal versions. OM13380 Figure 1. SPSH4 Server (Rack-Mount and Pedestal) 29
![](/manual_guide/products/intel-spsh4-product-guide-f2e29ab/29.png)