Compaq ProLiant 6400R Compaq ProLiant 6400R Servers - Page 157

OS Restart SCU Setting

Page 157 highlights

2 Compaq ProLiant 6400R Maintenance and Service Guide Integrated Management Log messages 3-57 network card slot, restart setting 3-56 network controller, restart setting 3-56 network frame type, restart setting 3-56 network host name, restart setting 3-56 network IP address, restart setting 3-56 network IP net mask, restart setting 3-56 network IP router address, restart setting 3-56 network protocol, restart setting 3-56 network status, restart setting 3-56 OS Restart SCU Setting, table 3-56 paging administrator 3-48 security 3-57 serial interface, restart setting 3-56 software error recovery 3-50 recovery boot option 3-50 recovery timeout 3-50 standby recovery server option 3-50 server port 3-50 time-out 3-50 thermal shutdown 3-50 timer 3-51 unattended recovery 3-48 UPS shutdown 3-50 UPS shutdown threshold 3-50 ASR-2 IML log messages See error log messages Asset Management, defined 3-64 audible beeps, during POST 3-7 Automatic Data Collection, defined 3-65 Automatic Revision Tracking See ART Automatic Server Recovery-2 See ASR-2 automatic storage reconstruction, defined 3-60 B backplane board connectors, identified 4-5 connectors, illustrated 4-5 power, removing 2-40 unplugging power cords, illustrated 2-43 basket insulator See PCI Hot Plug basket insulator battery connector, identified 4-4 installation, illustrated 2-50 installing 2-49 installing replacement 2-49 part number 1-5 beeps, during POST 3-7 bezel, front part number 1-3, 1-7 removing 2-8 removing, illustrated 2-8 replacing 2-8 blank cover, power supply, part number 1-7 boot password, disabling 4-7 buns, part number 1-7 C cable connector, miscellaneous, identified 4-5 cable folding and routing diagrams 2-21 cables 10-position power, part number 1-7 12-position power, part number 1-7 26-pin power sensor, part number 1-7 CD/LVD power, part number 1-7 CD-ROM drive, folding and routing diagram 2-21 diskette drive folding and routing diagram 2-22 signal, part number 1-7 folding and routing diagrams 2-21 hard drive power, part number 1-7 LVD signal, part number 1-7 miscellaneous power cable kit, part number 1-7 miscellaneous signal assembly, part number 1-7 miscellaneous signal, part number 1-7 PCI assembly, part number 1-7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173

2
Compaq ProLiant 6400R Maintenance and Service Guide
Integrated Management Log
messages
3-57
network card slot, restart
setting
3-56
network controller, restart
setting
3-56
network frame type, restart
setting
3-56
network host name, restart
setting
3-56
network IP address, restart
setting
3-56
network IP net mask, restart
setting
3-56
network IP router address, restart
setting
3-56
network protocol, restart
setting
3-56
network status, restart
setting
3-56
OS Restart SCU Setting,
table
3-56
paging administrator
3-48
security
3-57
serial interface, restart
setting
3-56
software error
recovery
3-50
recovery boot option
3-50
recovery timeout
3-50
standby recovery
server option
3-50
server port
3-50
time-out
3-50
thermal shutdown
3-50
timer
3-51
unattended recovery
3-48
UPS shutdown
3-50
UPS shutdown threshold
3-50
ASR-2 IML log messages
See
error
log messages
Asset Management, defined
3-64
audible beeps, during POST
3-7
Automatic Data Collection,
defined
3-65
Automatic Revision
Tracking
See
ART
Automatic Server
Recovery-2
See
ASR-2
automatic storage reconstruction,
defined
3-60
B
backplane board
connectors, identified
4-5
connectors, illustrated
4-5
power, removing
2-40
unplugging power cords,
illustrated
2-43
basket insulator
See
PCI Hot Plug
basket insulator
battery
connector, identified
4-4
installation, illustrated
2-50
installing
2-49
installing replacement
2-49
part number
1-5
beeps, during POST
3-7
bezel, front
part number
1-3, 1-7
removing
2-8
removing, illustrated
2-8
replacing
2-8
blank cover, power supply, part
number
1-7
boot password, disabling
4-7
buns, part number
1-7
C
cable connector, miscellaneous,
identified
4-5
cable folding and routing
diagrams
2-21
cables
10-position power, part
number
1-7
12-position power, part
number
1-7
26-pin power sensor, part
number
1-7
CD/LVD power, part
number
1-7
CD-ROM drive, folding and
routing diagram
2-21
diskette drive
folding and routing
diagram
2-22
signal, part number
1-7
folding and routing
diagrams
2-21
hard drive power, part
number
1-7
LVD signal, part number
1-7
miscellaneous power cable kit,
part number
1-7
miscellaneous signal assembly,
part number
1-7
miscellaneous signal, part
number
1-7
PCI assembly, part number
1-7