HP 6125G HP 6125G & 6125G/XG Blade Switches Layer 3 - IP Routing Confi - Page 24
BFD for static routes configuration example (indirect next hop), Network requirements, Configuration
View all HP 6125G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
display ip routing-table protocol static Public Routing Table : Static Summary Count : 1 Static Routing table Status : Summary Count : 1 Destination/Mask Proto Pre Cost NextHop Interface 120.1.1.0/24 Static 65 0 10.1.1.100 Vlan11 Static Routing table Status : Summary Count : 0 The output shows that Switch A communicates with Switch B through VLAN-interface 11 now. BFD for static routes configuration example (indirect next hop) Network requirements As shown in Figure 3, Switch A has a route to interface Loopback1 (2.2.2.9/32) on Switch B, with output interface VLAN-interface 10. Switch B has a route to interface Loopback1 (1.1.1.9/32) on Switch A, with output interface VLAN-interface 12. Switch D has a route to 1.1.1.9/32, with output interface VLAN-interface 10, and a route to 2.2.2.9/32, with output interface VLAN-interface 12. Configure static routes to subnet 120.1.1.0/24 on Switch A, static routes to subnet 121.1.1.0/24 on Switch B, and static routes to subnets 120.1.1.0/24 and 121.1.1.0/24 on both Switch C and Switch D. Enable BFD so that when the link between Switch A and Switch B through Switch D fails, BFD can detect the failure immediately and Switch A and Switch B can communicate through Switch C. Figure 3 Network diagram 121.1.1.0/24 Loop1 1.1.1.9/32 Switch D Loop1 2.2.2.9/32 120.1.1.0/24 Vlan-int10 Vlan-int10 Switch A Vlan-int11 BFD Vlan-int12 Vlan-int12 Vlan-int13 Switch B Vlan-int11 Vlan-int13 Device Switch A Switch C Interface Vlan-int10 Vlan-int11 Loop1 Vlan-int11 Vlan-int13 Switch C IP address 12.1.1.1/24 10.1.1.102/24 1.1.1.9/32 10.1.1.100/24 13.1.1.2/24 Device Switch B Switch D Interface Vlan-int12 Vlan-int13 Loop1 Vlan-int10 Vlan-int12 IP address 11.1.1.1/24 13.1.1.1/24 2.2.2.9/32 12.1.1.2/24 11.1.1.2/24 Configuration procedure 1. Configure IP addresses for the interfaces. (Details not shown.) 2. Configure static routes and BFD: # Configure static routes on Switch A and enable BFD control mode for the static route that traverses Switch D. system-view 14