Intel E6700 Mechanical Design Guidelines - Page 102
Thermocouple Wire Management
UPC - 735858184618
View all Intel E6700 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 102 highlights
Case Temperature Reference Metrology D.6 Thermocouple Wire Management When installing the processor into the socket, the thermocouple wire should route under the socket lid, as Figure 7-37. This will keep the wire from getting damaged or pinched when removing and installing the heatsink. Note: When thermocouple wires are damaged, the resulting reading maybe wrong. For example, if there are any cuts into the wires insulation where the wires are pinched between the heatsink and the socket lid when installing the heatsink, the thermocouple wires can get in contact at this location. In that case, the reported temperature would be the point of the heatsink/socket lid area. This temperature is usually much lower than the temperature at the center of the IHS. Prior to installing the heatsink, make sure that the thermocouple wires remain below the IHS top surface, by running a flat blade on top of the IHS for example. Figure 7-37. Thermocouple Wire Management § 102 Thermal and Mechanical Design Guidelines