Intel E6700 Mechanical Design Guidelines - Page 92

Position Bead on the Groove Step, Detailed Thermocouple Bead Placement

Page 92 highlights

Case Temperature Reference Metrology 11. While still at the microscope, press the wire down about 6mm [0.125"] from the thermocouple bead using the tweezers or your finger. Place a piece of Kapton* tape to hold the wire inside the groove (Figure 7-20). Refer to Figure 7-21 for detailed bead placement. Figure 7-20. Position Bead on the Groove Step Kapton* tape Wire section into the groove to prepare for final bead placement Figure 7-21. Detailed Thermocouple Bead Placement TC Wire with Insulation IHS with Groove TC Bead 92 Thermal and Mechanical Design Guidelines

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126

Case Temperature Reference Metrology
92
Thermal and Mechanical Design Guidelines
11.
While still at the microscope, press the wire down about 6mm [0.125”] from the
thermocouple bead using the tweezers or your finger. Place a piece of Kapton*
tape to hold the wire inside the groove (Figure 7-20). Refer to Figure 7-21 for
detailed bead placement.
Figure 7-20. Position Bead on the Groove Step
Figure 7-21. Detailed Thermocouple Bead Placement
TC Wire with Insulation
IHS with Groove
TC Bead
Wire section
into the
groove to
prepare for
final bead
placement
Kapton*
tape