LG PQCPA11A0E Owner's Manual - Page 137
Setting the power control text, Desired power, Desired operation ratio, Operation switching period
View all LG PQCPA11A0E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 137 highlights
3. ACP operation by using the LG ACCS 3 Setting the power control (text) The setup item to set the wattage in kW or % is displayed at the right side of the peak operation ratio control screen. If it exceeds the setting value, the air conditioner is forcefully operated periodically according to the peak power operation rule. Desired power It displays the desired power in kW per hour to operate the peak operation function. Desired operation ratio It displays the desired power in % to operate the peak operation function. Operation switching period It displays the period to forcefully stop the operatioin. Caution: Setting the demand control Because the demand control is set by the externally connected demand controller, the items such as desired power, desired operation ratio and operation switching period can not be set wihin the LG ACCS program. Installation/Owner's Manual 3-55