Epson R200 Service Manual - Page 36

Disassembly

Page 36 highlights

EPSON Stylus Photo R200/R210 Revision A 2.3 Disassembly The following flowchart shows the order of disassembling procedure. When disassembling any unit, refer to the page number shown in the flowchart. Start Paper Suuport Assy./Housing (right/left)/ Stacker Assy. removal NOTE: indicates that the procedure in the broken-line box is NOT the shortest removing procedure, but the passing point for the next removing procedure. NOTE: When removing 'CDR Guide Assy.' or 'Paper Guide, Front/ Roller EJ Assy.', We have to remove Carriage Unit before removing Printer Mechanism. Housing (frame)/Panel Assy./Panel Board removal ( CR Motor removal Unit removal Print Head removal Porous Pad, Paper Guide, Front removal Main Board removal Unit removal Holder, Shaft Unit removal Print Head removal Main Board removal Paper Guide, Upper removal DISASSEMBLY AND ASSEMBLY Unit removal Printer Mechanism/Housing (lower) removal Guide Assy. removal Motor removal Ink System Unit removal Paper Guide, Front/Roller, EJ Assy. removal Figure 2-1. Disassembly Procedure Flowchart Disassembly P/S Board Unit removal 36

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101

EPSON Stylus Photo R200/R210
Revision A
DISASSEMBLY AND ASSEMBLY
Disassembly
36
2.3
Disassembly
The following flowchart shows the order of disassembling procedure. When disassembling any unit, refer to the page number shown in the flowchart.
Figure 2-1.
Disassembly Procedure Flowchart
Start
Paper Suuport Assy./Housing (right/left)/
Stacker Assy. removal
(2.3.1
P.37)
Housing (frame)/Panel Assy./Panel
Board removal (
2.3.2
P.39)
ASF
Unit removal
(2.3.3
P.40)
CR Motor removal
(2.3.4
P.42)
Holder, Shaft Unit removal
(2.3.8
P.46)
Main Board removal
(2.3.7
P.45)
Main Board removal
(2.3.7
P.45)
APG
Unit removal
(2.3.9
P.49)
CR
Unit removal
(2.3.11
P.51)
PF
Motor removal
(2.3.17
P.71)
CDR
Guide Assy. removal
(2.3.14
P.62)
Ink System Unit removal
(2.3.15
P.64)
Paper Guide, Front/Roller, EJ Assy. removal
(2.3.16
P.67)
Printer Mechanism/Housing (lower)
removal
(2.3.12
P.57)
P/S Board Unit removal
(2.3.13
P.61)
Paper Guide, Upper removal
(2.3.10
P.50)
Print Head removal
(2.3.5
P.43)
Porous Pad, Paper Guide, Front
removal
(2.3.6
P.44)
Print Head removal
(2.3.5
P.43)
NOTE:
indicates that the procedure in the broken-line box is NOT the shortest
removing procedure, but the passing point for the next removing procedure.
NOTE:
When removing ’CDR Guide Assy.’ or ’Paper Guide, Front/ Roller EJ Assy.’, We
have to remove Carriage Unit before removing Printer Mechanism.