Epson R200 Service Manual - Page 77
Replacement Part-Based Adjustment Priorities
![]() |
UPC - 010343849532
View all Epson R200 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 77 highlights
EPSON Stylus Photo R200/R210 Revision A 3.1.2 Replacement Part-Based Adjustment Priorities The following table shows the adjustment items and their order for the replacement parts. Note: "Required" in this table indicates the adjustment items that must be implemented when the corresponding parts/units have been removed or replaced. "Recommended", on the other hand, indicates those which are recommended the adjustment after removing or replacing them. "-" means the adjustment is not needed. When having removed or replaced more than one part/unit, refer to the items that correspond to the parts/units. Table 3-6. Adjustment Item Performance Priority 1 2 3 4 5 6 7 8 9 10 11 12 EEPROM Data Copy Market Setting USB ID Input Waste Ink Pad Counter Ink Charge Head ID Input PG Adjustment First dot Adjustment PW Sensor Adjustment Head Angular Adjustment Bi-d Adjustment Offset Input for CR Motor Calorific Limitation "ASF Unit" Removal - - - - - - - Required - - - - "ASF Unit" Replacement - - - - - - - Required - - - - "CR Motor" Removal - - - - - - - Required Required Recommended Required - "CR Motor" Replacement - - - - - - - Required Required Recommended Required Required "Paper Guide Upper" Removal - - - - - - - - - - - - "Paper Guide Upper" Replacement - - - - - - - - - - - - "Front Frame" Removal - - - - - - - - - - - - "Front Frame" Replacement - - - - - - - - - - - - "CR Unit" Removal - - - - - - Required Required Required Recommended Required - "CR Unit" Replacement - - - - - - Required Required Required Recommended Required - "Print Head" Removal - - - - - - Required Required Required Required Required - "Print Head" Replacement - - - - Required Required Required Required Required Required Required - "Main Board" Removal - - - - - - - - - - - - "Main Board" Replacement Required - - - - - - - - - - - (Read OK) "Main Board" Replacement Required (Read NG) *1) The adjustment unit. has been - completed at the Required unit level of Required ASP supply. (Replacing HoWwPaesavtdeesI)rn,ksince - "Main Board", Required "Print Head" - and "ASF" Required are supplied Required separately, refer Required to the each Required Required item that corresponds to the part/ "Holder Shaft Unit" Removal - - - - - - - - - - - - "Holder Shaft Unit" Replacement - - - - - - - - - - - - "CR Guide Shaft" Removal - - - - - - Required Required Required - Required - "CR Guide Shaft" Replacement - - - - - - Required Required Required - Required Required ADJUSTMENT Adjustment Items and Overview 77
![](/manual_guide/products/epson-r200-service-manual-1506266/77.png)