Epson R200 Service Manual - Page 67

Paper Guide, Front/Roller EJ Assy. removal

Page 67 highlights

EPSON Stylus Photo R200/R210 2.3.16 Paper Guide, Front/Roller EJ Assy. removal o External View Spur Gear,37.242 PF Timing Belt Spur Gear, 41.48 Guide, Shaft, Frame EJ, Right Flat Washer Link EJ, Right Support Plate, Frame, Main Compression Spring, 1.27 Holder, Idle Roller Hook 2 1 C.B.S 3x6 (7-9kgf•cm) Guide, Shaft, Frame EJ, Left Extension Spring, Push Up, Plate, Left 2 1 Frame EJ Assy. Hooks Hooks Link EJ, Left Flat Washer Hook Figure 2-45. "Paper Guide, Front"/"Roller EJ Assy." removal (1) Revision A o Parts/Units which should be removed before removing "Paper Guide, Front"/"Roller EJ Assy." Paper Support Assy./Housing (left/right)/Housing (frame)/ASF Unit/Main Board/ Holder, Shaft Unit./APG Unit/Print Head/Carriage Unit/Housing (lower)/CDR Guide Assy./Ink System Unit o Disassembly Procedure 1. Remove the screws (x2) which secure "Support Plate, Frame, Main". Then, remove "Support Plate, Frame, Main". 2. Release the hook of "Link EJ, Right" from the groove of "Guide, Shaft, Frame EJ, Right". Then, remove "Link EJ, Right". 3. Remove the flat washer which secures the right side of "Frame EJ Assy.". 4. Remove "PF Timing Belt" from "Spur Gear, 37.242", then remove "Spur Gear, 41.48". 5. Remove "Compression Spring, 1.27" and "Holder, Idle Roller" together with "PF Timing Belt". 6. Move back "Carriage Unit" to the home position, and then remove "Frame EJ Assy." in the direction of the arrow, also in the order indicated in the figure. C A U T IO N When removing "Frame EJ Assy.", take care not to damage or transform "Star Wheels" of "Frame EJ Assy.". 7. Remove the flat washer which secures "Link EJ, Left", then Slide "Link EJ, Left" to the right. 8. Remove "Extension Spring, Push Up, Plate, Left" from the hooks of "Guide, Shaft, Frame EJ, Left" and "Frame, Main". 9. Release the hooks (Left x2, right x1) which secure "Guide, Shaft, Frame EJ, Left (Right)". Then, remove "Guide, Shaft, Frame EJ, Left (Right)". DISASSEMBLY AND ASSEMBLY Disassembly 67

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101

EPSON Stylus Photo R200/R210
Revision A
DISASSEMBLY AND ASSEMBLY
Disassembly
67
2.3.16
Paper Guide, Front/Roller EJ Assy. removal
±
External View
Figure 2-45.
"Paper Guide, Front"/"Roller EJ Assy." removal (1)
±
Parts/Units which should be removed before removing "Paper Guide,
Front"/"Roller EJ Assy."
Paper Support Assy./Housing (left/right)/Housing (frame)/ASF Unit/Main Board/
Holder, Shaft Unit./APG Unit/Print Head/Carriage Unit/Housing (lower)/CDR
Guide Assy./Ink System Unit
±
Disassembly Procedure
1.
Remove the screws (x2) which secure "Support Plate, Frame, Main". Then,
remove "Support Plate, Frame, Main".
2.
Release the hook of "Link EJ, Right" from the groove of "Guide, Shaft, Frame
EJ, Right". Then, remove "Link EJ, Right".
3.
Remove the flat washer which secures the right side of "Frame EJ Assy.".
4.
Remove "PF Timing Belt" from "Spur Gear, 37.242", then remove "Spur
Gear, 41.48".
5.
Remove "Compression Spring, 1.27" and "Holder, Idle Roller" together with
"PF Timing Belt".
6.
Move back "Carriage Unit" to the home position, and then remove "Frame EJ
Assy." in the direction of the arrow, also in the order indicated in the figure.
7.
Remove the flat washer which secures "Link EJ, Left", then Slide "Link EJ,
Left" to the right.
8.
Remove "Extension Spring, Push Up, Plate, Left" from the hooks of "Guide,
Shaft, Frame EJ, Left" and "Frame, Main".
9.
Release the hooks (Left x2, right x1) which secure "Guide, Shaft, Frame EJ,
Left (Right)". Then, remove "Guide, Shaft, Frame EJ, Left (Right)".
Compression
Spring, 1.27
Holder, Idle Roller
Spur Gear, 41.48
PF Timing Belt
Spur Gear,37.242
Link EJ, Right
Flat Washer
Guide, Shaft, Frame EJ, Right
Hook
C.B.S 3x6
(7-9kgf•cm)
1
2
Support Plate,
Frame, Main
1
2
Frame EJ Assy.
Extension Spring,
Push Up, Plate, Left
Guide, Shaft,
Frame EJ, Left
Hooks
Link EJ, Left
Flat Washer
Hooks
Hook
C
A
U
T
I
O
N
When removing "Frame EJ Assy.", take care not to damage or
transform "Star Wheels" of "Frame EJ Assy.".