Gateway 995 995 Series Server User Guide - Page 116
Label all cables connected to the system board with their location, then
![]() |
View all Gateway 995 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 116 highlights
Chapter 4: Installing Components 16 Label all cables connected to the system board with their location, then unplug them from the system board. Serial B port Front panel Fan signal SCSI channel A SCSI channel B IDE Diskette drive System board secondary power System board primary power System board power control 110 www.gateway.com
![](/manual_guide/products/gateway-computers-995-995-series-server-user-guide-d203082/116.png)
110
Chapter 4: Installing Components
www.gateway.com
16
Label all cables connected to the system board with their location, then
unplug them from the system board.
System
board power
control
System
board
secondary
power
Diskette
drive
IDE
SCSI
channel A
SCSI
channel B
System
board
primary
power
Front panel
Serial B port
Fan signal