HP LaserJet M1120 Service Manual - Page 51

Table 4-2, Power-on sequence, Sequence of operation continued

Page 51 highlights

Table 4-1 Sequence of operation (continued) Name Timing Purpose PRINT LSTR (last rotation) From the end of the INTR period until the primary high-voltage is turned off Forms the image on the photosensitive drum and transfers the toner image to the media From the end of the PRINT period (when high-voltage is turned off) until the main motor stops rotating Delivers the last page of a print job After LSTR, the product either returns to STBY or, if another print command was sent from the formatter, enters INTR. Table 4-2 Power-on sequence Step Action 1 Power-on 2 CPU initialization 3 Start video interface communication 4 Check sensors for residual media 5 Main motor initial drive 6 Fuser heater initial drive. The fuser heater reaches a surface temperature of 100o C. 7 Laser/scanner motor initial drive 8 High-voltage control Detect presence of a print cartridge Clean the transfer roller after the primary charging AC bias is turned on 9 Failure/abnormality check: detect laser/scanner failure, fuser failure, and open covers 10 Communication with the memory tag ENWW Basic operation 35

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224

Name
Timing
Purpose
PRINT
From the end of the INTR period until the primary
high-voltage is turned off
Forms the image on the photosensitive drum and
transfers the toner image to the media
LSTR (last
rotation)
From the end of the PRINT period (when high-voltage
is turned off) until the main motor stops rotating
Delivers the last page of a print job
After LSTR, the product either returns to STBY or, if
another print command was sent from the formatter,
enters INTR.
Table 4-2
Power-on sequence
Step
Action
1
Power-on
2
CPU initialization
3
Start video interface communication
4
Check sensors for residual media
5
Main motor initial drive
6
Fuser heater initial drive. The fuser heater reaches a surface temperature of 100
o
C.
7
Laser/scanner motor initial drive
8
High-voltage control
Detect presence of a print cartridge
Clean the transfer roller after the primary charging AC bias is turned on
9
Failure/abnormality check: detect laser/scanner failure, fuser failure, and open covers
10
Communication with the memory tag
Table 4-1
Sequence of operation (continued)
ENWW
Basic operation
35