Honeywell NX4S1 Installation Guide - Page 35

Default Downstream I/O Configuration with Wiring

Page 35 highlights

NetAXS™ NX4S1 Installation Installation The following figure shows the default downstream I/O system configuration with communication and power wiring. This configuration has not been reviewed by UL. Figure 15: Default Downstream I/O Configuration with Wiring NetAXS Access Control Unit NX4S1 Installation Guide, Document 800-00008, Revision A 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73

NetAXS™ NX4S1 Installation
Installation
NetAXS Access Control Unit NX4S1 Installation Guide
,
Document 800-00008, Revision A
25
The following figure shows the default downstream I/O system configuration with communication and
power wiring. This configuration has not been reviewed by UL.
Figure 15:
Default Downstream I/O Configuration with Wiring