IBM RS6000 Service Guide - Page 51
Step 1540-4
View all IBM RS6000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 51 highlights
Step 1540-4 No failure was detected with this configuration. 1. Turn the power off and remove the power cable. 2. Install a pair of memory DIMMs. 3. Reinstall the power cable. 4. Turn the power on. 5. Wait for the operator panel to stabilize at a checkpoint. Note: Checkpoints E1F2, E1F3 and STBY are stable as soon as they appear. Other checkpoints may take up to 3 minutes to assure stability, depending on system configuration. Does the operator panel stabilize with code E1F2, E1F3, E1F7, or STBY? NO Go to "Step 1540-5" on page 2-22. YES Repeat this step until all the memory DIMMs are installed and tested. After all the memory DIMMs are installed and tested, record the positions of the memory DIMMs in the second memory card. Remove all of the memory DIMMs from the second memory card except 1 pair. Repeat this step with the second memory card (if previously installed). Go to "Step 1540-7" on page 2-24. Chapter 2. Maintenance Analysis Procedures 2-21